Papworth Hospital PFI

Troup Bywaters + Anders maintain their reputation of excellence in the healthcare sector by successfully reaching Financial Close for the landmark new Papworth Hospital. Following the highly sought after and competitive bidding stages, TB+A - as part of the Skanska team – has been chosen as the Trust’s preferred solution.

The combination of state of the art treatment facilities and a unique model of care will put the new Papworth Hospital at the top of their field.

The project relocates the world famous Papworth Hospital to the expanding Cambridge Biomedical Campus, creating a new 310 single bed inpatient specialist heart and lung hospital with major outpatient’s facilities and a hot floor of CCU, 7 theatres, hybrid suites, 5 catheterisation labs and imaging.

The building envelope and engineering system design, combine to deliver energy efficient solutions which exceed the Trust’s energy target and greatly exceed the Trust’s and Local Authorities carbon and renewable energy targets.

The hospital is the first to achieve an EPC ‘B’ energy rating which is a fantastic achievement for a specialist hospital.

The design of the New Papworth Hospital incorporates a number of lessons learnt from our other major specialist healthcare projects, such as St Bartholomew’s, including:

  • Highly resilient electrical infrastructure all the way to point of use
  • Integrating the latest medical equipment technology whilst allowing for a late procurement solution
  • Flexibility for change of use by good design and future space allocation for additional plant
  • Efficient energy centre location and planning
  • Interstitial plant to minimise vertical services risers
  • Multi energy source solution to maximise reliability whilst delivering on green credentials such as primary heating and cooling to the building provided via a thermal storage ground source heat pump system with a bio-diesel CHP

As the images and the hospital demonstrates this is a truly remarkable building with low carbon engineering solutions delivering exceptional low energy and carbon performance.

Photos courtesy of Andrew Meredith

< Back to Projects...

VALUE
£160 million

AREA
40,000m²

CLIENT
Papworth Hospital NHS Foundation Trust

CONTRACTOR
Skanska

STRUCTURAL ENGINEER
Skanska Tech

ARCHITECT
HOK

SERVICES PROVIDED
Engineering services design

OFFICE
London

COMPLETION
2019

 

Alan Newman and the TB+A team have been central to the development of our new purpose built and state of the art, Royal Papworth Hospital, ensuring that we have a facility that has enabled our team to deliver tomorrow’s treatments today. Recognising the importance of establishing positive and long term relationships, the TB+A values and approach has led to a close working relationship between ourselves, TB+A and partner organisations.

Stephen Posey

CEO, Royal Papworth

Featured Healthcare Projects

Croydon University Hospital - Emergency Department

Papworth Hospital PFI

Lister Hospital, ‘Our Changing Hospitals’

Chase Farm Hospital Redevelopment

See further project work

National leads

Alan Newman
020 7504 1400 M: 07813 169 836
Terry Canty
020 7504 1400 M: 07976 626 999